DOSEN UNTAR

MEGA WATY
(S.T., M.T., Dr.)
Unit Kerja
S2 TEKNIK SIPIL
Bidang Ilmu
Minat Penelitian
Pendidikan
- SARJANA, PROGRAM STUDI : TEKNIK, TEKNIK SIPIL UNIV. 17 AGUSTUS 1945 SAMARINDA
- MAGISTER, PROGRAM STUDI : TEKNIK, TEKNIK SIPIL UNIVERSITAS KRISTEN PETRA
- DOKTOR, PROGRAM STUDI : TEKNIK SIPIL, TEKNIK SIPIL UNIVERSITAS TARUMANAGARA
Penelitian (92 Data)
Judul : PENGHEMATAN BIAYA PEMBANGUNAN GEDUNG X DENGAN MUTU BETON BERBEDA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A180225102025.pdfJudul : Impact of Change Orders on Cost Overruns and Delays in Large-Scale Construction Projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A120225133408.pdfJudul : ANALISIS TANTANGAN DAN PENGELOLAAN RISIKO PROYEK PEMBANGUNAN IBU KOTA NUSANTARA DENGAN PENDEKATAN KUALITATIF
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A120225093003.pdfJudul : Impact ofChangeOrdersonDecreasingLaborProductivityinRoad Construction Projects(ApproachusingStructuralEquationModeling)
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A120225082218.pdfJudul : The Effect of Value Co-Creation, and Corporate Image on Building Customer Loyalty Toward Apartment Contractor: The Mediating Role of Customer Satisfaction
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_7A071224115407.pdfJudul : The Impact of Change Orders on the Waste Materials of Large-Scale Projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A071224074612.pdfJudul : LOSS ANALYSIS OF ROAD CONSTRUCTION PROJECTS IN DKI JAKARTA DUE TO WASTE MATERIALS
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A011124085136.pdfJudul : ANALISIS CHANGE ORDER RATIO PADA PROYEK BENGKEL SPBU
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A050924081025.pdfJudul : PENYEBAB SISA MATERIAL PADA PROYEK PEMBANGUNAN RUMAH TINGGAL X DI SERANG
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A050924080740.pdfJudul : ANALISIS COST OVERRUNS PADA PROYEK X
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A050924080429.pdfJudul : ANALISIS METODE EARNED VALUE UNTUK PREDIKSI PENYELESAIAN PROYEK KONSTRUKSI APARTEMEN X DI TANGERANG
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A050924080040.pdfJudul : Analisis Change Order pada Proyek SPBU
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A270824075934.pdfJudul : ROAD CONSTRUCTION CHANGE ORDER ANALYSIS (TECHNICAL CAUSES AND INITIATORS)
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_3A230724104305.pdfJudul : KETIDAKLENGKAPAN KONTRAK DAN SENGKETA KONSTRUKSI DI INDONESIA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A170524081704.pdfJudul : OCCUPATIONAL HEALTH AND SAFETY SYSTEM DEVELOPMENT AT INDONESIA REPRESENTATIVE COUNCIL BUILDING USING STRUCTURAL EQUATION MODELING
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010524180240.pdfJudul : FACTORS IDENTIFICATION AFFECTING OCCUPATIONAL HEALTH AND SAFETY SYSTEM USING DELPHI METHOD AT INDONESIA REPRESENTATIVE COUNCIL BUILDING
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010524175952.pdfJudul : Factors Of Affecting The Occurrence Of Cost Overruns In Construction Projects During COVID-19 Pandemic
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_3A150424151400.pdfJudul : The Rank of Factors Affecting Labor Productivity on Construction Projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_3A150424151214.pdfJudul : IDENTIFICATION OF ROAD CONSTRUCTION RISK
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_3A150424150604.pdfJudul : Analisis faktor dampak change order terhadap waste material
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E170224090722.pdfJudul : ANALISIS BATA RINGAN YANG PECAH SAAT DIANGKAT OLEH TOWER CRANE
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A070224153730.pdfJudul : ANALISIS NILAI WASTE KERAMIK PADA PROYEK X
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A070224153426.pdfJudul : PERINGKAT PENGARUH FAKTOR-FAKTOR SMK3L TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK IT MANDIRI BUMI SLIPI JAKARTA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A070224152914.pdfJudul : The main causes of waste materials at warehouse construction project
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A131223161111.pdfJudul : Analysis of importance level of change order for road construction projects (from the owner?s point of view)
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A131223160818.pdfJudul : ANALISIS RISIKO KERJA PROYEK PEMBANGUNAN IT MANDIRI BUMI SLIPI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A271123114323.pdfJudul : Case study of waste material 2 development projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A311023103424.pdfJudul : Waste Material Proyek Skala Kecil
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E241023094655.pdfJudul : PENYEBAB CHANGE ORDER PROYEK KONSTRUKSI RUMAH SAKIT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010623100930.pdfJudul : DAMPAK CHANGE ORDER PROYEK KONSTRUKSI BANGUNAN GEDUNG BERTINGKAT SEDANG
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010623100304.pdfJudul : PENERAPAN METODE EARNED VALUE DAN EARNED SCHEDULE PELAKSANAAN PROYEK RUMAH SAKIT X DI BANDUNG
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010623095659.pdfJudul : PENGARUH LINGKUNGAN KERJA, PELAKSANAAN K3, DAN TENAGA KERJA TERHADAP PRODUKTIVITAS TENAGA KERJA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010623095250.pdfJudul : Konstruksi Bangunan Gedung dan Infrastruktur yang Berkelanjutan dan Berkeselamatan
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_11B020423161354.pdfJudul : Perbandingan dampak change order
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E020423160516.pdfJudul : Penyebab Change Order Proyek Konstruksi
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E020423155544.pdfJudul : KOMBINASI DAMPAK CHANGE ORDER
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E020423154248.pdfJudul : Study of selecting floor cover by using the value engineering method in the housing project
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A020423131234.pdfJudul : Calculation of Change Order
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A020423123922.pdfJudul : Implementation of Occupational Safety Health Management Systems During COVID-19 Pandemic on High-Rise Building Construction Projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A020423122727.pdfJudul : Analysis of Change Order Base On the type of Road Construction
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A010423214351.pdfJudul : ANALISIS FAKTOR KERUGIAN WASTE MATERIAL BESI BETON GEDUNG
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423211849.pdfJudul : IDENTIFIKASI RISIKO CHANGE ORDER KONSTRUKSI JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423210151.pdfJudul : CHANGE ORDER DAN RISIKO CHANGE ORDER PROYEK JALAN DI JAWA BARAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423204643.pdfJudul : KERUGIAN KONTRAKTOR AKIBAT WASTE MATERIAL KONSTRUKSI GEDUNG BERTINGKAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423174229.pdfJudul : ANALISIS SISA MATERIAL DAN PENYEBAB UTAMANYA PROYEK BANGUNAN RUMAH TINGGAL
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423173046.pdfJudul : PENERAPAN METODE VALUE ENGINEERING DALAM PEMILIHAN JENIS BETON PROYEK KONSTRUKSI PERUMAHAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423171755.pdfJudul : PENYEBAB CHANGE ORDER PADA PROYEK BANGUNAN AIR WILAYAH DKI JAKARTA Article
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423170424.pdfJudul : IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA RUMAH TINGGAL
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423165225.pdfJudul : ANALISIS FAKTOR PENYEBAB COST OVERRUN PADA PROYEK RUMAH INDONESIA SEHAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_3A010423164022.pdfJudul : ANALISIS FAKTOR PENYEBAB COST OVERRUN PADA PROYEK RUMAH INDONESIA SEHAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423164013.pdfJudul : ANALISIS PERANAN KONSULTAN MANAJEMEN DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423162312.pdfJudul : ANALISIS SISA MATERIAL PADA PROYEK PABRIK
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423160323.pdfJudul : PENYEBAB TERJADINYA SISA MATERIAL PADA BANGUNAN SUPERMARKET
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423155210.pdfJudul : PERINGKAT FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423153252.pdfJudul : PERINGKAT FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK KONSTRUKSI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A010423150927.pdfJudul : IMPACT OF CHANGE ORDERS ON ROAD CONSTRUCTION PROJECT: CONSULTANS PERSPECTIVE
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A010423145049.pdfJudul : KOMBINASI DAMPAK CHANGE ORDER PROYEK KONSTRUKSI JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_10A260323154510.pdfJudul : Study of selecting floor cover by using the value engineering method in the housing project
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A260323152139.pdfJudul : KOMBINASI DAMPAK CHANGE ORDER PROYEK KONSTRUKSI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E270123194334.pdfJudul : KOMBINASI DAMPAK CHANGE ORDER PROYEK KONSTRUKSI JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E270123152526.pdfJudul : PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK KONSTRUKSI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A270123150206.pdfJudul : PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A270123150049.pdfJudul : ANALISIS KORELASI PERSENTASE BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK PERKERASAN JALAN KAKU
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194654.pdfJudul : PENYEBAB CHANGE ORDER PADA PROYEK PERKERASAN JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194452.pdfJudul : ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN GEDUNG DAN PERUMAHAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194316.pdfJudul : FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA BANGUNAN HIGH RISE DI REPUBLIK INDONESIA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194117.pdfJudul : ANALISIS HUBUNGAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA TERHADAP TINGKAT KECELAKAAN PADA PROYEK
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822193857.pdfJudul : ANALISIS KORELASI BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK JALAN ASPAL PROVINSI BANTEN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822193424.pdfJudul : CALCULATION OF CHANGE ORDER FOR ROAD PROJECTS IN JAKARTA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A260822095510.pdfJudul : Road construction project waste material recommendations
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_6A260822094906.pdfJudul : DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822092956.pdfJudul : PERHITUNGAN CHANGE ORDERPROYEK JALAN DI BANTEN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822092341.pdfJudul : ANALISIS SISA MATERIAL DAN PENYEBAB UTAMANYA PADA PROYEK BANGUNAN RUMAH TINGGAL
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822091510.pdfJudul : PENYEBAB TERJADINYA SISA MATERIAL PADA BANGUNAN GEDUNG SUPERMARKET
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822091041.pdfJudul : PENYEBAB CHANGE ORDER PADA PROYEK KONSTRUKSI BANGUNAN AIR WILAYAH DKI JAKARTA
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822090403.pdfJudul : ANALISIS FAKTOR-FAKTOR PENYEBAB COST OVERRUN PADA PROYEK RUMAH INDONESIA SEHAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822085923.pdfJudul : ANALISIS PERANAN KONSULTAN MANAJEMEN KONSTRUKSI DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822085612.pdfJudul : ANALISIS SISA MATERIAL PADA PROYEK PEMBANGUNAN PABRIK
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A260822085157.pdfJudul : CHANGE ORDER DAN RISIKO CHANGE ORDER PADA PROYEK JALAN DI JAWA BARAT
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A250822203307.pdfJudul : PENERAPAN METODE VALUE ENGINEERING DALAM PEMILIHAN JENIS BETON PADA PROYEK KONSTRUKSI PERUMAHAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A250822180259.pdfJudul : Perbandingan dampak change order dari sisi konsultan dan sisi owner
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_15E240822194044.pdfJudul : IMPACT OF CHANGE ORDERS ON ROAD CONSTRUCTION PROJECT: CONSULTANS? PERSPECTIVE
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A180822192511.pdfJudul : IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA PROYEK RUMAH TINGGAL
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A020322213756.pdfJudul : Penyebab Change Order Proyek Konstruksi Jalan
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_2A020322212814.pdfJudul : Analysis of Change Orders Based on the Type of Road Construction
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A020322212011.pdfJudul : Implementation of Occupational Safety and Health Management Systems During COVID-19 Pandemic on High-Rise Building Construction Projects
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A020322211739.pdfJudul : CAUSES FOR THE CHANGE ORDERS IN ROAD CONSTRUCTION: REVIEWED FROM OWNER
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A020322205334.pdfJudul : IDENTIFIKASI RISIKO CHANGE ORDER PROYEK KONSTRUKSI JALAN
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A270821092646.pdfJudul : Menulis Jurnal Perhitungan Change Order
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A070000.pdfJudul : prosiding Road Construction IOP
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_20A182429.pdfJudul : Menulis jurnal Nasional judul Identifikasi Risiko
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A155445.pdfJudul : Menulis jurnal Identifikasi Risiko Lanjutan
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A202848.pdf

Pengabdian Kepada Masyarakat (34 Data)
Judul : Menjadi pembicara Construction Project Executing
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_9C010225144738.pdfJudul : Menjadi pembicara Construction Project Planning
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_9C010225144429.pdfJudul : Menjadi pembicara Construction Management 2
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_9C010225144136.pdfJudul : Menjadi pembicara Construction Management 1
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_9C010225143848.pdfJudul : Pembicara Webinar Identifikasi dan Mitigasi Risiko Cost Overrun pada Proyek Konstruksi
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C171224074131.pdfJudul : Menjadi nara sumber Handling the Impact of Change Orders in the Construction Industry
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_9C220824090218.pdfJudul : Menjadi reviewer Jurnal JMTS edisi Mei 2024
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_7C170524080835.pdfJudul : FGD Pemantauan dan Evaluasi Kinerja
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_7C060524174250.pdfJudul : Rapat Koordinasi Penilaian Kinerja Penyedia Jasa Konstruksi pada Masa Konstruksi di LingkunganKementerianPUPR denganPenawaranTerkoreksi diBawah 80%
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_7C060524172752.pdfJudul : Forum Group Discussion (FGD) Penyusunan Pedoman Monitoring dan Evaluasi Penilaian Kinerja Penyedia Jasa Konstruksi di Lingkungan Kementerian Pekerjaan Umum dan Perumahan Rakyat
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_7C060524172258.pdfJudul : Menjadi Reviewer Jurnal Mitra Teknik Sipil
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_11D160224110455.pdfJudul : Mengikuti seminar The Third International Conference of Construction, Infrastructure and Materials 2023 (paper 63)
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_6C110823075107.pdfJudul : Mengikuti seminar The Third International Conference of Construction, Infrastructure and Materials 2023 (paper 157)
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_6C100823182507.pdfJudul : Pembicara dalam ICASTE 2023
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_6C010523103949.pdfJudul : Menjadi pembicara TICATE 2022
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C030423205646.pdfJudul : Menjadi pembicara dalam seminar The Second
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C030423205059.pdfJudul : Menjadi pembicara dalam seminar Conference Tarumanagara
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C030423204434.pdfJudul : Pendampingan Evaluasi Kerusakan Jalan
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C030423202333.pdfJudul : Pendampingan Evaluasi Kerusakan Jalan untuk Pengajuan Anggaran Perbaikan di Lingkungan Kompleks Pondok Cibubur, Depok
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_5C020423202922.pdfJudul : Menjadi moderator Konteks 15 Semarang
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_7C020423172703.pdfJudul : Menjadi pembicara dalam seminar Conference Tarumanagara International
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_2B020423170321.pdfJudul : Menjadi pembicara dalam seminar International The Second International Conference of Construction Infrastructure and Materials
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_2B020423163731.pdfJudul : Menjadi pembicara dalam seminar Tarumanagara International Conference on the Application of Social Sciences & Humanities
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_2B020423163203.pdfJudul : Mengajar SMK Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C260123092745.pdfJudul : Mengajar RAB di smk Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C190822140450.pdfJudul : Mengikuti seminar Nasional Series 2 Characterpreneurship Karakter yang diharapkan dalam Enterpreneurship Masa Depan
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_11D180822194729.pdfJudul : Mengajar Auto Cad di SMK Malaka ganjil 21-22
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C120222125804.pdfJudul : Moderator Seminar KONTEKS 15
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_11D110222191842.pdfJudul : Mengajar Auto Cad di SMK Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C270821141943.pdfJudul : Mengajar Auto Cad di SMK Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_00Z200421130033.pdfJudul : Moderator Konteks 2020
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_00Z170421175302.pdfJudul : Mengajar Auto Cad di SMK Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_00Z170421175011.pdfJudul : Mengajar AutoCad Lanjutan di SMK Malaka
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C160421203848.pdfJudul : Memberikan penyuluhan dalam TIm Pendamping Ijazah
Link File : https://lintar.untar.ac.id/repository/pengabdian/buktiabdi_10318005_8C205654.pdf

Publikasi (73 Data)
THE IMPACT OF CHANGE ORDERS ON THE WASTE MATERIALS OF LARGE-SCALE PROJECTS
Nama Jurnal : Engineering, Technology & Applied Science Research
Tahun : 2024
ISSN : 1792-8036
Vol : 14
Nomor : 6
Halaman : 18363-18370
Url : https://etasr.com/index.php/ETASR/article/view/8910IMPACT OF CHANGE ORDERS ON WASTE MATERIAL OF ROAD CONSTRUCTION PROJECT
Nama Jurnal : Planning Malaysia
Tahun : 2024
ISSN : 1675-6215
Vol : 22
Nomor : 2
Halaman : 533-549
Url : https://planningmalaysia.org/index.php/pmj/article/view/1487CONTRACT INCOMPLETENESS AND CONSTRUCTION DISPUTES IN INDONESIA
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2024
ISSN : 2622-545X
Vol : 7
Nomor : 2
Halaman : 489-502
Url : https://journal.untar.ac.id/index.php/jmts/article/view/27338ANALYSIS OF CERAMIC WASTE VALUE IN PROJECT X
Nama Jurnal : jurnal Mitra Teknik Sipil
Tahun : 2024
ISSN : 2622 -545X
Vol : 7
Nomor : 1
Halaman : 237-248
Url : https://journal.untar.ac.id/index.php/jmts/article/view/26610ANALYSIS OF LIGHT BRICKS THAT BROKE WHEN LIFT BY TOWER CRANE
Nama Jurnal : jurnal Mitra Teknik Sipil
Tahun : 2024
ISSN : 2622 -545X
Vol : 7
Nomor : 1
Halaman : 249-254
Url : https://journal.untar.ac.id/index.php/jmts/article/view/26630RANKING OF THE INFLUENCE OF SMK3L FACTORS ON WORKFORCE PRODUCTIVITY OF THE MANDIRI BUMI SLIPI JAKARTA IT PROJECT
Nama Jurnal : jurnal Mitra Teknik Sipil
Tahun : 2024
ISSN : 2622 -545X
Vol : 7
Nomor : 1
Halaman : 45-56
Url : https://journal.untar.ac.id/index.php/jmts/article/view/24943FACTORS IDENTIFICATION AFFECTING OCCUPATIONAL HEALTH AND SAFETY SYSTEM USING DELPHI METHOD AT INDONESIA REPRESENTATIVE COUNCIL BUILDING
Nama Jurnal : Jurnal Infrastruktur Universitas Pancasila
Tahun : 2024
ISSN : 2476-9339
Vol : 10
Nomor : 1
Halaman : 1-8
Url : https://journal.univpancasila.ac.id/index.php/infrastrukturOCCUPATIONAL HEALTH AND SAFETY SYSTEM DEVELOPMENT AT INDONESIA REPRESENTATIVE COUNCIL BUILDING USING STRUCTURAL EQUATION MODELING
Nama Jurnal : Jurnal Infrastruktur Universitas Pancasila
Tahun : 2024
ISSN : 2476-9939
Vol : 10
Nomor : 1
Halaman : 9-18
Url : https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/5888FACTORS OF AFFECTING THE OCCURRENCE OF COST OVERRUNS IN CONSTRUCTION PROJECTS DURING COVID-19 PANDEMIC
Nama Jurnal : International Journal of Application on Sciences, Technology and Engineering (IJASTE)
Tahun : 2023
ISSN : 2987-2499
Vol : 1
Nomor : 2
Halaman : 685-694
Url : https://journal.untar.ac.id/index.php/ijaste/article/view/29555FACTORS OF AFFECTING THE OCCURRENCE OF COST OVERRUNS IN CONSTRUCTION PROJECTS DURING COVID-19 PANDEMIC
Nama Jurnal : International Journal of Application on Sciences, Technology and Engineering (IJASTE)
Tahun : 2023
ISSN : 2987-2499
Vol : 1
Nomor : 2
Halaman : 685-694
Url : https://journal.untar.ac.id/index.php/ijaste/article/view/29555THE RANK OF FACTORS AFFECTING LABOR PRODUCTIVITY ON CONSTRUCTION PROJECTS
Nama Jurnal : International Journal of Application on Sciences, Technology and Engineering (IJASTE)
Tahun : 2023
ISSN : 2987-2499
Vol : 1
Nomor : 2
Halaman : 656-665
Url : https://journal.untar.ac.id/index.php/ijaste/article/view/29431MANDIRI BUMI SLIPI IT DEVELOPMENT PROJECT WORK RISK ANALYSIS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2023
ISSN : 2622-545X
Vol : 6
Nomor : 4
Halaman : 885-898
Url : https://journal.untar.ac.id/index.php/jmts/article/view/24917ANALYSIS OF IMPORTANCE LEVEL OF CHANGE ORDER FOR ROAD CONSTRUCTION PROJECTS (FROM THE OWNER?S POINT OF VIEW)
Nama Jurnal : AIP COnference Preceeding
Tahun : 2023
ISSN : 1551-7616
Vol : 2680
Nomor : 1
Halaman : 1-9
Url : https://pubs.aip.org/aip/acp/article/2680/1/020008/2928405/Analysis-of-importance-level-of-change-order-forTHE MAIN CAUSES OF WASTE MATERIALS AT WAREHOUSE CONSTRUCTION PROJECT
Nama Jurnal : AIP Conference Proceedings
Tahun : 2023
ISSN : 1551-7616
Vol : 2680
Nomor : 1
Halaman : 1-6
Url : https://pubs.aip.org/aip/acp/article/2680/1/020026/2928440/The-main-causes-of-waste-materials-at-warehouseCOMPARISON OF CHANGE ORDER RISK IDENTIFICATION ROAD CONSTRUCTION PROJECTS
Nama Jurnal : E3S Web of Conferences
Tahun : 2023
ISSN : 2267-1242
Vol : 429
Nomor : 01009
Halaman : 1-8
Url : https://www.e3s-conferences.org/articles/e3sconf/abs/2023/66/e3sconf_iccim2023_01009/e3sconf_iccim2023_01009.htmlAPPLICATION OF THE EARNED VALUE METHOD AND EARNED SCHEDULE OF THE X HOSPITAL PROJECT IN BANDUNG
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2023
ISSN : 2622-545X
Vol : 6
Nomor : 2
Halaman : 237-248
Url : https://journal.untar.ac.id/index.php/jmts/article/view/22251CAUSES OF CHANGE ORDERS IN HOSPITAL CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2023
ISSN : 2622-545X
Vol : 6
Nomor : 2
Halaman : 429-440
Url : https://journal.untar.ac.id/index.php/jmts/article/view/22252CASE STUDY OF WASTE MATERIAL 2 DEVELOPMENT PROJECTS
Nama Jurnal : E3S Web of Conferences
Tahun : 2023
ISSN : 2267-1242
Vol : 429
Nomor : 01005
Halaman : 1-7
Url : https://www.e3s-conferences.org/articles/e3sconf/abs/2023/66/e3sconf_iccim2023_01005/e3sconf_iccim2023_01005.htmlTHE EFFECT OF WORK ENVIRONMENT, OHS IMPLEMENTATION, AND LABOR ON LABOR PRODUCTIVITY
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2023
ISSN : 2622-545X
Vol : 6
Nomor : 2
Halaman : 355-366
Url : https://journal.untar.ac.id/index.php/jmts/article/view/21975IMPACT OF CHANGE ORDER IN MEDIUM-STORY BUILDING CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2023
ISSN : 2622-545X
Vol : 6
Nomor : 2
Halaman : 367-382
Url : https://journal.untar.ac.id/index.php/jmts/article/view/21974IDENTIFICATION OF ROAD CONSTRUCTION RISK
Nama Jurnal : International Journal of Application on Sciences, Technology and Engineering (IJASTE)
Tahun : 2023
ISSN : 2987-2499
Vol : 1
Nomor : 2
Halaman : 631-642
Url : https://journal.untar.ac.id/index.php/ijaste/article/view/29428RATING OF FACTORS INFLUENCING COST OVERRUN IN CONSTRUCTION PROJECTS DURING THE COVID-19 PANDEMIC
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 3
Halaman : 671-680
Url : https://journal.untar.ac.id/index.php/jmts/article/view/20258RANKING OF FACTORS AFFECTING LABOR PRODUCTIVITY IN CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 3
Halaman : 681-692
Url : https://journal.untar.ac.id/index.php/jmts/article/view/20247ANALYSIS OF THE CAUSES OF COST OVERRUN IN THE HEALTHY INDONESIAN HOUSE PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 1
Halaman : 15-24
Url : https://journal.untar.ac.id/index.php/jmts/article/view/16649CAUSES OF THE OCCURRED MATERIALS IN THE SUPERMARKET BUILDING
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 1
Halaman : 129-140
Url : https://journal.untar.ac.id/index.php/jmts/article/view/16648/9696ANALYSIS OF THE ROLE OF CONSTRUCTION MANAGEMENT CONSULTANTS IN PREVENTING CONSTRUCTION TIME DELAYS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 1
Halaman : 141-152
Url : https://journal.untar.ac.id/index.php/jmts/article/view/16651CAUSES FOR THE CHANGE ORDERS IN ROAD CONSTRUCTION: REVIEWED FROM OWNER
Nama Jurnal : COMMUNICATIONS_Scientific Letters of University of Zilina
Tahun : 2022
ISSN : 2585-7878
Vol : 24
Nomor : 2
Halaman : 72-84
Url : https://komunikacie.uniza.sk/artkey/csl-202202-0008_causes-for-the-change-orders-in-road-construction-reviewed-from-owner.phpANALYSIS OF CHANGE ORDERS BASED ON THE TYPE OF ROAD CONSTRUCTION
Nama Jurnal : Proceeding of the Second International Conference of Consctruction, Infrastructure and Materials
Tahun : 2022
ISSN : 978-981-16-7949-0
Vol : 216
Nomor : 1
Halaman : 479-487
Url : https://link.springer.com/chapter/10.1007/978-981-16-7949-0_43IMPLEMENTATION OF OCCUPATIONAL SAFETY AD HEALTH MANAGEMENT SYSTEMS DURING COVID-19 PANDEMIC ON HIGH RISE BUILDING CONSTRUCTION PROJECT
Nama Jurnal : Proceeding of the Second International Conference of Consctruction, Infrastructure and Materials
Tahun : 2022
ISSN : 978-981-16-7949-0
Vol : 216
Nomor : 1
Halaman : 489-496
Url : https://link.springer.com/chapter/10.1007/978-981-16-7949-0_44ANALYSIS OF RESISTANT MATERIALS ON FACTORY DEVELOPMENT PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2022
ISSN : 2622-545X
Vol : 5
Nomor : 1
Halaman : 87-98
Url : https://journal.untar.ac.id/index.php/jmts/article/view/16573IMPACT OF CHANGE ORDERS ON ROAD CONSTRUCTION PROJECT: CONSULTANS? PERSPECTIVE
Nama Jurnal : Journal of Applied Engineering Science
Tahun : 2022
ISSN : 1821-3197/ 1451-4117
Vol : 20
Nomor : 3
Halaman : 736-744
Url : https://aseestant.ceon.rs/index.php/jaes/article/view/35894APPLICATION OF VALUE ENGINEERING METHOD IN SELECTION OF CONCRETE TYPES IN HOUSING CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2021
ISSN : 2622-545X
Vol : 4
Nomor : 1
Halaman : 261-270
Url : https://journal.untar.ac.id/index.php/jmts/article/view/10408/7096ANALYSIS OF RESISTANT MATERIALS AND ITS MAIN CAUSES IN RESIDENTIAL BUILDING PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2021
ISSN : 2622-545X
Vol : 4
Nomor : 1
Halaman : 343-352
Url : https://journal.untar.ac.id/index.php/jmts/article/view/10393/7095ANALYSIS OF LOSS FACTORS OF WASTE MATERIALS IRON CONCRETE STORE BUILDING
Nama Jurnal : Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan
Tahun : 2021
ISSN : ISSN-L 2579-6410
Vol : 5
Nomor : 1
Halaman : 235-242
Url : https://journal.untar.ac.id/index.php/jmistki/article/view/10120/7472RISK IDENTIFICATION OF ROAD CONSTRUCTION PROJECT CHANGE ORDER
Nama Jurnal : Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan
Tahun : 2021
ISSN : ISSN-L 2579-6410
Vol : 5
Nomor : 1
Halaman : 225-234
Url : https://journal.untar.ac.id/index.php/jmistki/article/view/10094CHANGE ORDER AND CHANGE ORDER RISK ON ROAD PROJECTS IN WEST JAVA
Nama Jurnal : Jurnal Paduraksa Jurnal teknik Sipil Universitas Warmadewa
Tahun : 2021
ISSN : 2581-2939
Vol : 10
Nomor : 1
Halaman : 124-141
Url : https://www.ejournal.warmadewa.ac.id/index.php/paduraksa/article/view/2387CONTRACTOR LOSSES DUE TO WASTE MATERIALS CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Paduraksa Jurnal teknik Sipil Universitas Warmadewa
Tahun : 2021
ISSN : 2581-2939
Vol : 10
Nomor : 1
Halaman : 84-98
Url : https://www.ejournal.warmadewa.ac.id/index.php/paduraksa/article/view/2385IDENTIFICATION OF COST OVERRUN CAUSES
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2021
ISSN : 2622-545 x
Vol : 4
Nomor : 3
Halaman : 633-640
Url : https://journal.untar.ac.id/index.php/jmts/article/view/12502/8069CAUSES OF CHANGE ORDER IN THE DKI JAKARTA WATER CONSTRUCTION PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2021
ISSN : 2622-545 x
Vol : 4
Nomor : 1
Halaman : 249-260
Url : https://journal.untar.ac.id/index.php/jmts/article/view/10289/7097IMPACT OF CHANGE ORDER ON ROAD PADDING PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 1
Halaman : 199-206
Url : https://journal.untar.ac.id/index.php/jmts/article/view/7023/4954IMPACT OF THE CHANGE ORDER ON THE ROAD PAVEMENT PROJECT
Nama Jurnal : JMTS Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545X
Vol : 3
Nomor : 1
Halaman : 199-206
Url : https://journal.untar.ac.id/index.php/jmts/article/view/7023/4954IDENTIFICATION OF ADVANCE RISKS TO SOURCES AND CAUSES OF MATERIAL WASTE IN ROAD CONSTRUCTION PROJECTS
Nama Jurnal : Media Komunikasi Teknik Sipil
Tahun : 2020
ISSN : 2549-6778
Vol : 26
Nomor : 1
Halaman : 104-117
Url : https://ejournal.undip.ac.id/index.php/mkts/article/view/21817ANALYSIS OF APPLICATION OF OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT SYSTEMS IN BUILDING AND HOUSING DEVELOPMENT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 3
Halaman : 547-554
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8324/5672CORRELATION ANALYSIS OF CHANGE ORDER COST PERCENTAGE TO WORK WEIGHT ON TWO RIGID ROAD PAVEMENT PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 1
Halaman : 191-198
Url : https://journal.untar.ac.id/index.php/jmts/article/view/6931/4952CAUSES OF CHANGE ORDER ON ROAD PADDING PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 1
Halaman : 207-214
Url : https://journal.untar.ac.id/index.php/jmts/article/view/7012/4957CORRELATION ANALYSIS OF CHANGE ORDER COSTS TO WORK WEIGHT IN TWO BANTEN PROVINCE ASPHALT ROAD PROJECTS
Nama Jurnal : JMTS Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545x
Vol : 3
Nomor : 1
Halaman : 175-182
Url : https://journal.untar.ac.id/index.php/jmts/article/view/6965CORRELATION ANALYSIS OF CHANGE ORDER COSTS PERCENTAGE OF WORK WEIGHT IN TWO KAKU ROAD CROSSING PROJECTS
Nama Jurnal : JMTS Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545x
Vol : 3
Nomor : 1
Halaman : 191-198
Url : https://journal.untar.ac.id/index.php/jmts/article/view/6931/4952CAUSES OF CHANGE ORDER ON ROAD HARDWARE PROJECTS
Nama Jurnal : JMTS Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545x
Vol : 3
Nomor : 1
Halaman : 207-214
Url : https://journal.untar.ac.id/index.php/jmts/article/view/7012/4957CALCULATION OF CHANGE ORDER FOR ROAD PROJECTS IN BANTEN
Nama Jurnal : Muara
Tahun : 2020
ISSN : 2579-6410
Vol : 4
Nomor : 2
Halaman : 211-220
Url : https://journal.untar.ac.id/index.php/jmistki/article/view/6342ANALYSIS OF THE IMPLEMENTATION OF OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT SYSTEM IN BUILDING AND HOUSING DEVELOPMENT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545X
Vol : 3
Nomor : 3
Halaman : 547-554
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8324STUDY OF SELECTING FLOOR COVER BY USING THE VALUE ENGINEERING METHOD IN THE HOUSING PROJECT
Nama Jurnal : IOP Conference Series : Material Science and Engineering
Tahun : 2020
ISSN : 1757-899X
Vol : 1007
Nomor : 1
Halaman : 1-7
Url : https://iopscience.iop.org/article/10.1088/1757-899X/1007/1/012076FACTORS AFFECTING LABOR PRODUCTIVITY IN HIGH RISE BUILDINGS IN THE REPUBLIC OF INDONESIA
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545X
Vol : 3
Nomor : 4
Halaman : 1313-1326
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8366/6558RELATIONSHIP ANALYSIS OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM TO ACCIDENT LEVELS IN THE PROJECT
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545X
Vol : 3
Nomor : 4
Halaman : 1363-1372
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8365/6562CALCULATION OF CHANGE ORDER FOR ROAD PROJECTS IN JAKARTA
Nama Jurnal : IOP Conference Series : Material Science and Engineering
Tahun : 2020
ISSN : 1757-899X
Vol : 1007
Nomor : 1
Halaman : 1-7
Url : https://iopscience.iop.org/article/10.1088/1757-899X/1007/1/012001FACTORS AFFECTING LABOR PRODUCTIVITY IN HIGH RISE BUILDING IN THE REPUBLIC OF INDONESIA
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 4
Halaman : 1313-1326
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8366/6558ANALYSIS OF THE RELATIONSHIP OF OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT SYSTEMS TO ACCIDENT RATE ON PROJECTS
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 4
Halaman : 1363-1372
Url : https://journal.untar.ac.id/index.php/jmts/article/view/8365CHANGE ORDER COST CORRELATION ANALYSIS OF WORK WEIGHT ON TWO ASPHALT ROAD PROJECTS BANTEN PROVINCE
Nama Jurnal : Jurnal Mitra Teknik Sipil
Tahun : 2020
ISSN : 2622-545 x
Vol : 3
Nomor : 1
Halaman : 175-182
Url : https://journal.untar.ac.id/index.php/jmts/article/view/6965/4951RISK ASSESSMENT (RISK ASSESSMENT) WASTE MATERIALS ROAD IMPROVEMENT PROJECT
Nama Jurnal : PADURAKSA
Tahun : 2019
ISSN : 2581-2939
Vol : 8
Nomor : 1
Halaman : 117-131
Url : https://www.ejournal.warmadewa.ac.id/index.php/paduraksa/article/view/1219WASTE MATERIAL RISK ASSESSMENT OF THE ROAD IMPROVEMENT PROJECT
Nama Jurnal : Jurnal PADURAKSA
Tahun : 2019
ISSN : 2303-2693
Vol : 8
Nomor : 1
Halaman : 117-133
Url : https://ejournal.warmadewa.ac.id/index.php/paduraksa/article/view/1219EARLY??RISKS??IDENTIFICATION ON SOURCES AND CAUSES WASTE ROAD CONSTRUCTION PROJECT MATERIALS
Nama Jurnal : IOP Conference Series,: Material Science and Engineering, volume 508, conference 1
Tahun : 2019
ISSN : 1757-899X
Vol : 508
Nomor : 1
Halaman : 1-8
Url : https://iopscience.iop.org/article/10.1088/1757-899X/508/1/012008/pdfROAD CONSTRUCTION PROJECT WASTE MATERIAL RECOMMENDATIONS
Nama Jurnal : Journal of Physic , IOP COnference Series , Material Scienc and Engineering
Tahun : 2019
ISSN : 1757-899X
Vol : 650
Nomor : 1
Halaman : 1-6
Url : https://iopscience.iop.org/article/10.1088/1757-899X/650/1/012031MODELLING OF WASTE MATERIAL COST ON ROAD CONSTRUCTION PROJECT
Nama Jurnal : International Journal of Engineering & Technology (UEA)
Tahun : 2018
ISSN : 2227-524x
Vol : 7
Nomor : 2
Halaman : 474-477
Url : https://www.sciencepubco.com/index.php/ijet/issue/view/295SENSIVITY ANALYSIS WITH AHP METHOD: SELECTION OF FOUNDATION DESIGN ON BRIDGE SEI MUARA BULAN ANAK 2
Nama Jurnal : Journal of Physics. Conference Series, Volume 1028, conference 1
Tahun : 2018
ISSN : 1742-6598
Vol : 1028
Nomor : 1
Halaman : 1-12
Url : https://iopscience.iop.org/article/10.1088/1742-6596/1028/1/012069CALCULATION OF RETAINING WALL TYPE COUNTERFORT STRUCTURE ON SUNGAI PAYANG ROAD SECTION LOA KULU DISTRICT
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2015
ISSN : 2339-2665
Vol : III
Nomor : 1, Maret 2015
Halaman : 40-59
Url : http://repository.untar.ac.id/id/eprint/12100EVALUATION OF REMAINING MATERIAL IN THE CONSTRUCTION PROJECT OF THE OUTER RING ROAD, MAHULU STREET, JAKARTA ROAD
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2015
ISSN : 2339-2665
Vol : III
Nomor : II, Juli 2015
Halaman : 1-16
Url : http://repository.untar.ac.id/id/eprint/12102CALCULATION OF CONCRETE BRIDGE STRUCTURAL BRIDGE REINFORCED IN MUANG TERRACE IN JONGKANG VILLAGE
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2014
ISSN : 2339-2665
Vol : III
Nomor : 1, Maret 2014
Halaman : 10-20
Url : http://repository.untar.ac.id/id/eprint/12103COST AND TIME PERFORMANCE ANALYSIS WITH THE CONCEPT OF EARNED VALUE ANALYSIS IN BUILDING CONSTRUCTION PROJECTS
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2014
ISSN : 2339-2665
Vol : II
Nomor : 1, Juli 2014
Halaman : 1-17
Url : http://repository.untar.ac.id/id/eprint/12120THE ROLE OF CONTRACTORS IN IMPROVING CONSTRUCTABILITY IN THE CONSTRUCTION OF BRIDGE ROADS IN THE EAST KALIMANTAN REGION
Nama Jurnal : Media Komunikasi Teknik Sipil
Tahun : 2013
ISSN : 0854-1809
Vol : 19
Nomor : 1
Halaman : 27-39
Url : https://ejournal.undip.ac.id/index.php/mkts/article/view/7832/6418ANALYSIS OF EAST KALIMANTAN EDUCATION AGENCY BUILDING STRUCTURE
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2013
ISSN : 2339-2665
Vol : II
Nomor : 1, Juli 2013
Halaman : 1-12
Url : http://repository.untar.ac.id/id/eprint/12121Contractors Role in Improving COnstructability on East Kalimantan Bridge Construction
Nama Jurnal : Media Komunikasi Teknik Sipil Universitas Diponegoro
Tahun : 2013
ISSN : 0854-1089
Vol : 19
Nomor : 1
Halaman : 27-39
Url : https://ejournal.undip.ac.id/index.php/mkts/article/view/7832CALCULATION OF DEVELOPMENT PLANNING FOR WARU PENAJAM WATER TREATMENT PLANT IN NORTH PASER DISTRICT
Nama Jurnal : Jurnal Kurva S Universitas 17 Agustus 1945 Samarinda
Tahun : 2013
ISSN : 2339-2665
Vol : 1
Nomor : 1, Maret 2013
Halaman : 31-41
Url : http://repository.untar.ac.id/id/eprint/12101The Bendali 3 Action Plan at Gunung Bahagia Balikpapan
Nama Jurnal : Media Sains
Tahun : 2012
ISSN : 2085-3548
Vol : 4
Nomor : 2
Halaman : 12-20
Url : http://kopertis11.or.id/jurnal_baca.php?id=120ANALYSIS AND EVALUATION CHANGE ORDER IN FLEXIBLE PAVEMENT (CASE STUDY: ROAD PROJECTS IN EAST KALIMANTAN)
Nama Jurnal : Media Komunikasi Teknik Sipil
Tahun : 2008
ISSN : 2549-6778
Vol : 16
Nomor : 1
Halaman : 31-47
Url : https://ejournal.undip.ac.id/index.php/mkts/article/view/3664

Penghargaan
Wisudawan terbaik Sarjana pada Universitas 17 Agustus 2004
Dari Institusi : Universitas 17 Agustus 1945 Samarinda, Tahun 2004, Tingkat Regional

Tautan
