Penelitian (Total : 10051 Data)
Judul : ANALISIS VALUE ENGINEERING PADA PROYEK PERUMAHAN DJAJAKUSUMAH RESIDENCE
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 2/3
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822203502.pdf
Judul : PENERAPAN METODE MONTE CARLO PADA PENJADWALAN PROYEK SERPONG GARDEN APARTMENT
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 2/3
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822203321.pdf
Judul : WASTE MATERIAL BETON PADA PROYEK KONSTRUKSI DI JAKARTA
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822203050.pdf
Judul : STUDI ANALISIS PERSENTASE WASTE BESI BETON DAN FAKTOR PENYEBABNYA PADA BANGUNAN BERTINGKAT RENDAH DI JAKARTA
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822202832.pdf
Judul : PENYEBAB CHANGE ORDER PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/3
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822202510.pdf
Judul : PRODUKTIVITAS PEKERJA DALAM PEKERJAAN PEMASANGAN DINDING BATA DENGAN METODE CREW BALANCE CHART
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/3
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822201656.pdf
Judul : PRODUKTIVITAS PEKERJA DALAM PEKERJAAN PLESTERAN DINDING BATA DENGAN METODE CREW BALANCE CHART
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/4
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822200547.pdf
Judul : Pengaruh Change Order Terhadap Biaya Mutu Waktu Pada Proyek Konstruksi Gedung Bertingkat
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 3/4
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822200330.pdf
Judul : PERANCANGAN OTOMATIS PERHITUNGAN EARNED VALUE PADA PROYEK PEMBANGUNAN DENGAN MENGGUNAKAN BAHASA PEMROGRAMAN C#
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 4/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822200119.pdf
Judul : PERBANDINGAN INVESTASI DENGAN SEWA ALAT BERAT PADA PROYEK PEMBANGUNAN HOTEL IBIS RADEN SALEH JAKARTA
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 4/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_4A310822195440.pdf
Judul : The Most Influencing Factors on the Causes of Construction Claims and Disputes in the EPC Contract Model of Infrastructure Projects in Indonesia
Peneliti : HENDRIK SULISTIO (Ir., Ir., M.T., Dr.),
Info : 11/2
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_11017001_3A310822195243.pdf
Judul : ANALISIS KORELASI PERSENTASE BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK PERKERASAN JALAN KAKU
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194654.pdf
Judul : PENYEBAB CHANGE ORDER PADA PROYEK PERKERASAN JALAN
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194452.pdf
Judul : ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN GEDUNG DAN PERUMAHAN
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/3
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194316.pdf
Judul : FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA BANGUNAN HIGH RISE DI REPUBLIK INDONESIA
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/4
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822194117.pdf
Judul : ANALISIS HUBUNGAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA TERHADAP TINGKAT KECELAKAAN PADA PROYEK
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/4
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822193857.pdf
Judul : ANALISIS KORELASI BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK JALAN ASPAL PROVINSI BANTEN
Peneliti : MEGA WATY (Dr. S.T., M.T.),
Info : 3/1
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A310822193424.pdf
Judul : Production Layout Replanning Using Systematical Layout Planning with Shared Storage Method Analysis and Flexsim Simulation in Garment and Textile Company
Peneliti : CARLA OLYVIA DOALY (S.T., M.T.),
Info : 2021
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10317001_6A310822150242.pdf
Judul : Production planning and capacity control with demand forecasting using artificial neural network (Case study PT. Dynaplast) for industry 4.0
Peneliti : CARLA OLYVIA DOALY (S.T., M.T.),
Info : 2021
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10317001_6A310822123002.pdf
Judul : Improving the Capacity of Espresso Machine Using Reverse Engineering Method and VDI 2221 Method
Peneliti : CARLA OLYVIA DOALY (S.T., M.T.),
Info : 2021
Link File : https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10317001_6A310822122521.pdf